UPGRADE AND IMPROVEMENTS WASTEWATER TREATMENT PLANT, SMITHFIELD, RI

Owner: USFilter Operating Services
Engineer: Maguire Group, Inc.
Contract Amount: $4,436,190
Completion Date: June 2006

The existing Smithfield plant is currently being upgraded under a design/build contract with Veolia Water. The upgrades include:

  • Removal and replacement of two 75’ “Tobro” type secondary clarifiers
  • Removal of three existing vertical shaft driven centrifugal pumps and installation of dry pit submersible pumps
Installation of:
  • New influent channel grinder and screw at the Headworks Structure
  • New three-stage odor control system and associated collection system
  • Odor control covers at the primary clarifier and the aeration tanks
  • New fine bubble diffuser system, stainless steel process air piping and two 150 HP process air blowers
  • New mixers and recycle pumps in existing aeration tanks
  • Pressure treated wood baffle systems in existing aeration tanks
  • Two new effluent disk filters in the existing micro filtration building
  • New gravity belt thickener in the existing sludge handling building
  • New ferric chloride system, including chemical tank, pumps and distribution system
  • New line silo, foundation and distribution system