•  
  • HOME
  • COMPANY
  • SERVICES
  • PROJECTS
  • NEWS
  • CONTACT US
LOG IN
  • CURRENT PROJECTS
  • PAST PROJECTS

EVERGREEN PUMPING STATION INTERIM IMPROVEMENTS AND REHABILITATION , WATERFORD, CT

Owner: Town of Waterford, CT
Engineer: Wright Pierce
Contract Amount: $481,199
Completion Date: January 2005

Evergreen Pump Station Improvements include:

  • Construct emergency bypass pumping connection facilities at the existing 12-inch and 30-inch ductile iron force mains
  • Install aluminum grating at open channels in wetwell area.
  • Install wetwell mixer system consisting of submersible mixer(s) mounted
    on a rail system.
  • Install one new wastewater pump to replace one of the existing larger pumps, including a new pump and motor with variable frequency drive, along with new pump suction and discharge piping and valves.
  • Repair existing 48-inch influent sluice gate to provide positive shutoff. Install new extension stem and manual gate operator. Provide portable hand held electric operator to allow operation of sluice gate. Install new outside electrical outlet for portable handheld electrical operator.
©2023 Carlin Contracting Co., Inc. all rights reserved.
Sitemap

PAST PROJECTS

MORE PROJECTS