SURFSIDE WASTEWATER TREATMENT FACILITY UPGRADES, NANTUCKET, MA

Owner: Town of Nantucket, MA
Engineer: Woodard & Curran
Contract Amount: $6,649,500.00
Start Date: July 2017

The project consists of upgrades to the Surfside Wastewater Treatment Facility, which includes all labor, material, equipment, services and construction inherent to the following work:
  • Construction of a new building enclosing the existing Headworks structure, including a separate electrical room and associated structural, electrical and controls improvements.
  • Demolition and replacement of the three primary sludge pumps, grinders, valves, electrical and controls within the existing Primary Sludge Building.
  • Demolition and replacement of the draft pumps, Pre-Anoxic Mixers, including electrical and control components as well as structural modifications to the existing Advanced Treatment Tanks.
  • Modifications to the existing aeration piping and valves in the Advanced Treatment Tanks and Advanced Treatment Building.